1. Requirements from the ODIT-led Requirements Panel
More information and documents are available from the ODIT site. See Groupware
Requirements Panel.
1.1. The schedule and time-lines
The schedule can be read from several documents:
- Original schedule document (25 January 2008). Put to Capital Steering Group and
PRAC-ICT Groups during February. Since then many dates have been pushed back due to
delays at the start of the project (PDF document),
(Word document)
- Further dates are listed in the Project Brief
document (PDF).
1.2. Main Project Documents
1.3. Requirements documents
- Final functional and technical requirements for the Invitation to Tender (issued
on 10 April 2008) are shown in the RequirementsDoc.xml document/page.
- Information for technology demonstrators, including the use case scenarios used
as a vehicle to demonstrate the software: Instructions for Demonstrators
(PDF).
1.4. Migration and Archiving
The objective of the Migration and Archive SIG is to support the Groupware Project and the
OUCS Groupware Team in planning the migrations from existing email systems to the new
OUCS Microsoft Exchange system and to advise on moving data or otherwise from existing
archives as well as planning for future archiving practice.
1.5. Other documentation and web sites