6. Timeline

The project was originally set in motion at the end of 2005/start of 2006. Since then roughly 10 Frodo units a month have been installed in units by OUCS's Network Control team (Geoff Lescott, Chris Burchell, Pierre Ramsay). Mounting of the wall cabinets was dealt with separately by a number of sub-contractors.

  • 3rd February 2006 - 21 installations
  • 9th October - 81 installations
  • 15th December 2006 - 100 installations
  • 5th April 2007 - 131 installations
  • 21st November 2007 - 169 installations
  • 28th February 2008 - 180 installations

Up: Contents Previous: 5. Costs