6. Timeline
The project was originally set in motion at the end of 2005/start of 2006. Since then roughly 10 Frodo units a month have been installed in units by OUCS's Network Control team (Geoff Lescott, Chris Burchell, Pierre Ramsay). Mounting of the wall cabinets was dealt with separately by a number of sub-contractors.